MIL-PRF-32504
4.5.6.2.4 Alternate toxicity analysis: Verify the shelter system and component products qualify for
commercial sale in the state of California.
4.5.6.3 Safety verification: Complete one flammability verification and the hazards inspection.
Visually inspect the shelter system is free of hazardous burrs, nicks, sharp edges, foreign materials, or
other conditions creating physical danger to a user.
4.5.7 Electrical Power distribution system: Visually inspect the complete electrical system to verify that
it contains an Underwriter Laboratory (UL) approved main electrical power distribution panel as well as
the required electrical components for the operation of the shelter.
4.5.7.1 Power distribution panel: Visually inspect the main electrical power distribution panel to verify
it contains the UL approval for wet weather locations. Determine the main distribution panel is of three
phase 120/208 volt design and the circuits are balanced. Verify the main circuit breaker controls the sub
circuits. Inspect the individual circuit breakers to determine that they are of the proper current carrying
capacity and are of the Ground Fault Circuit Interrupter (GFCI) design. Visually inspect to determine the
main electric panel is properly grounded.
4.5.7.2 Electrical duplex outlets: Visually inspect the duplex outlets to determine that they are
weatherproof design of 20 amp capacity and are equally spaced about the shelter.
4.5.7.3 Electric winches: Visually inspect each electric winch to determine that they are approved by
UL for wet locations and are of heavy-duty construction, operating on 120/208 power. Measure the time
that is required to fully open or fully close the full width end door to determine that it does not exceed
five (5) minutes duration.
4.5.7.4 Power connecting cables: Inspect all the power connecting cables to determine that they are of
the heavy-duty commercial type SOOW or equivalent and of the proper current carrying size for the
specific application. The quick disconnect twist lock or screw type connectors shall be connected with
the main power distribution panels or other components to insure their interface compatibility.
4.5.7.5 Exit signage: Verify that signage is in accordance with UFC 3-600-01 Section 2-5.2 "Means of
Egress Marking".
4.5.7.6 Electric ventilation fans: Each electric ventilation fan shall be checked for operation by
connecting it to the specified connector on the main electrical power distribution panel. Turning the
switch to "ON" shall cause operation of the ventilation fan.
4.5.7.7. Lighting: Visually inspect that the lights supplied with the shelter system provide general
illumination and are energy efficient. Visually inspect that the system is sufficient to allow operations to
19
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business